Check list used when performing a test case

When executing a test case which is verifying a function, interference, fault situation etc. in TelORB some steps always has to be done before, during and after the test to ensure that the system is behaving as it should.

Here is a list of what to do. To see more information about each step, click on the item.

To do before the test case

  1. Remove all error dumps
  2. Check Alarms and Notifications
  3. Check statistics for Demo2000
  4. Check the processor load
  5. Prepare the syslog

To do during the test case

  1. Look for error dumps
  2. Look for Alarms and Notifications
  3. Monitor the processor load
  4. Look for messages in the syslog
  5. Check the console logs

To do after the test case

  1. Analyse all received error dumps
  2. Analyse all unexpected Alarms and Notifications
  3. Check statistics for Demo2000
  4. Check the processor load
  5. Analyse messages in the syslog
  6. Redo the test without faulty situations
  7. Mark the test case/trouble report as "tested", if OK


2001-05-16 Andreas Johansson
http://uabweb.uab.ericsson.se/inside/units/f/dv/uabadas/TestCaseCheckList/CheckList.htm